Aufgabenstellung
Beschreibung der Aufgabe 2
Zu beurteilende Tabelle
Critique
- Introducing extra column containing Time Period (e.g. Quarter 3, Quarter 4)
- More than one font used
- Some of the Fonts used are of the 'fancy type' and thus poorly readable.
- Date Format not consistent in length. Better use two-digit day and month.
- Date separation: Better use dash - than slash / (/ easily read as 1 )
- Typo in line 5: 101112003
- Typo in last line: 10/1612003
- Transaction date is right-aligned, therefore too close to description of Expense-Type.
Correction of Table
Links