Teaching:TUW - UE InfoVis WS 2009/10 - Gruppe 06 - Aufgabe 3: Difference between revisions

From InfoVis:Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 14: Line 14:


===Redesign===
===Redesign===
====Total Hazardous Waste Production (2005)====
[[Image:Diagramm1.jpg|700px]]


[[Image:Diagramm2.jpg|900px]]
[[Image:Diagramm2.jpg|1322px]]


* We made two graphs that separate the information. The first one shows the values of the hazardous waste production. That is acutally the key information in the graph.
* We made two graphs that separate the information. The second one shows the values of the hazardous waste production. That is acutally the key information in the graph.
* The values are ordered in a bar chart.
* The values are ordered in a bar chart.
* The ship routes are only labelled by the continents, the additional information (goods etc) is removed, because that information is not as important.
* The ship routes are only labelled by the continents, the additional information (goods etc) is removed, because that information is not as important.

Revision as of 22:25, 6 December 2009

Aufgabenstellung

Beschreibung der Aufgabe 3

Zu verbessernde Grafik





Critique about the Graph

  • data ink ratio is very high
  • The world map is not really necessary (except for showing the shipment routes)
  • The circles are overlapping
  • The values are not ordered (because they are shown on the map)
  • Much unimportant information, only the necessary info should be on the graph

Redesign

  • We made two graphs that separate the information. The second one shows the values of the hazardous waste production. That is acutally the key information in the graph.
  • The values are ordered in a bar chart.
  • The ship routes are only labelled by the continents, the additional information (goods etc) is removed, because that information is not as important.