Teaching:TUW - UE InfoVis WS 2005/06 - Gruppe 10 - Aufgabe 2: Difference between revisions
Jump to navigation
Jump to search
Line 18: | Line 18: | ||
== Good Graphic == | == Good Graphic == | ||
[[Image:Diagramm 01.png|none|thumb|600px|First proposal for new Graphics]] | [[Image:Diagramm 01.png|none|thumb|600px|none|First proposal for new Graphics]] |
Revision as of 16:55, 29 October 2005
Poor Graphic
Problems:
- Changing scale of the time line in mid-axis to make exponential growth linear (from slides). This is called the Lie Factor
- The Lie Factor also makes one believe that there's continuity in the data.
- Bad Data-Ink-Ratio
- It is not very aestetic
- Could have some more colors
- Quite a lot of Chart Junk can be found in the graphic. The pictures of the doctors and the pictures of the other working men for example.
Proposals for new graphic:
- Choose linear time scale without jumps
- Analyze distribution (linear, exponential?)
- Choose appropriate diagram type
- Make the design simpler, without making it less understandable.
- Make a scale on the left side.